PT | EN Sign in

OmniObra User Guide

Everything OmniObra does, step by step: from registering the project to the daily log on site, from costs to the printed report with your company's logo. Use the index on the side or the search to go straight to a topic.

Administrator Sets up the company, creates the users, defines permissions and takes care of the subscription. Sees and does everything.
Team Engineers, site foremen, supervisors, buyers. Each one sees and does what the administrator allows.
Client The project's client. Follows it on the portal, read only: progress, photos, daily log and shared documents.

Sections marked Administrator appear only to the administrator. The others depend on each person's permissions — see Users and permissions.

Getting started All

Create the company account

  1. On the OmniObra home page, click Start free trial (or Create a company account on the sign-in screen).
  2. Fill in the company name, your name, WhatsApp, e-mail, a username and the password (at least 6 characters).
  3. Recovery PIN (optional): 4 to 6 digits that let you create a new password on your own if you forget yours. Left blank, it stays at the default 0000 and the system reminds you to change it.
  4. If you like, choose the plan you are interested in — nothing is charged during the trial.
  5. Read and tick the box accepting the Terms of use and the Privacy policy — without it the account is not created.
  6. Click Start 7-day free trial. You go straight to the Dashboard, as the company administrator.

Sign in

On the home page, click Sign in and use your username or e-mail with the password. If the same username exists in more than one company, the system asks you to sign in with your e-mail. After 5 wrong passwords in a row, you have to wait 1 minute. With 10 wrong passwords in 30 minutes (even from another browser), that login stays blocked until the half hour is over — or until support releases it.

Getting to know the screen

  • Side menu, on the left, split into Operations, Records and Account. On a phone, tap ☰ at the top — or swipe from the left edge — to open it.
  • The numbers next to Tasks and Requests show what is waiting for you.
  • Colored bars at the top flag what needs attention: PIN still at the default, trial or subscription ending.
  • When you save, edit, complete or delete, a window in the middle of the screen confirms what happened — see Confirmations and notices.
  • User guide, at the bottom of the menu, opens this manual.
  • PT | EN, at the bottom of the menu, switches the language — see My profile.

A plan to get started

  1. Company details — upload the logo and fill in tax ID, phone and address. They appear in the header of everything you print.
  2. Users — register who will use the system and tick what each one can do.
  3. Workers and tools — the field team and the company's equipment.
  4. Clients — the projects' clients and, if you want, their access to the portal.
  5. First project — register it with the suggested schedule ticked.
  6. Budget — enter the planned costs in the project's Costs tab.
  7. Daily log — from then on, one or more entries per working day.

Confirmations and notices All

OmniObra talks to you through windows in the middle of the screen — on the computer and on the phone.

Before: confirm

Actions that change a lot ask for confirmation first: deleting any record, completing a project, phase or task, reopening a task, approving or rejecting a request, marking as delivered, removing the logo and signing out. The window says exactly what is going to happen.

  • Cancel, the Esc key or a click outside the window back out — nothing changes.
  • For deletions the button is red and Cancel comes selected: an accidental Enter deletes nothing.

After: the result

  • It worked (saved, edited, deleted, completed): a green window with ✓ that closes by itself in a few seconds. Hover over it to make it wait.
  • It did not work (required field empty, file rejected…): a red window that stays until you click OK.
  • When part worked and part did not (e.g. 5 photos uploaded and 1 rejected), the window lists both.

Leave without saving?

If you started filling in a form and click another menu or tab, the system asks before leaving: Keep editing takes you back to the form with everything you typed; Leave without saving discards it. Closing the tab or reloading the page also warns you.

Clicked Save twice on a slow connection? The second click is ignored — the button keeps spinning until the page answers, and nothing is saved twice.

Install on the phone and the computer All

OmniObra works as an app: once installed, it gets an icon on the home screen and opens full screen (without the browser bar) straight on the sign-in screen — or on the dashboard, if you are already signed in.

Android (Chrome)

  1. Open the system's address in Chrome and sign in.
  2. Tap ⋮ (top right corner) → Install app or Add to Home screen.

iPhone and iPad (Safari)

  1. Open the system's address in Safari.
  2. Tap Share (the square with the arrow) → Add to Home Screen.

Computer (Chrome or Edge)

The install icon (a monitor with an arrow) appears in the address bar. Click it and then Install. OmniObra becomes a program, with a shortcut in the Start menu.

No signal on site? Instead of the browser's error screen, the app shows a “No connection” notice and comes back by itself when the internet returns. What was already saved is not lost.

Dashboard

It is the first screen after signing in: the situation of all projects at once.

  • Indicators: projects in progress (and how many are past their deadline), average physical progress, actual cost for the month (above or below budget) and open tasks (and overdue ones).
  • Projects being tracked: the progress of each project and how many days are left — or how many days it is late.
  • Budget × actual per project, as a chart.
  • Latest daily logs entered by the team.
  • Alerts: phase due in the next 7 days, late phase, requests awaiting approval, overdue tasks, project with cost more than 5% over budget and project in progress with no daily log for more than 3 days. Click the alert to go straight to it.
  • My tasks (for the administrator, Open tasks) and Shortcuts to enter a daily log, open a request, generate a report and register a project.

Register and track projects

Register a project

Path: Projects→+ New project — requires the Add project permission.

  1. Identification: project number and name (required), address, client and engineer of record. The chosen client is the one who follows the project on the portal.
  2. Deadlines and amounts: planned start, planned completion, contract value and status.
  3. In Create an initial schedule?, choose the list of phases: first come your company's templates and then the system's ready-made lists (construction, interiors, ACM façade, painting, electrical, joinery, paving, signage). The phases are spread between the two dates, and afterwards you can rename, delete or add more. If you prefer to build it by hand, tick Don't create a schedule. To create your own lists, see Schedule templates.
  4. Signatures on the statement of responsibility: the engineer and the site foreman sign with a finger or the mouse (Clear erases the stroke).
  5. On the right, tick the assigned team (active workers) and the available tools — they are then shown as “in use”.
  6. Click Add project.
Each plan has a project limit. When you reach it, the system warns you and points to the upgrade in My subscription. Cancelled projects do not count toward the limit.

Find and track

The Projects list shows status, physical progress, deadline (the end date turns red when it passes) and budgeted/actual cost with the variance percentage. Filter by name, number or address, by status and by client.

StatusWhen to use it
PlanningProject registered, not yet under way.
In progressProject under way — it is the status that generates the daily log and deadline alerts.
PausedWork temporarily stopped.
CompletedProject delivered (records who completed it and the actual date).
CancelledProject that will not happen; it leaves the reports and the plan limit.

Edit, complete and delete

  • Edit (Edit project permission): the same form as the registration, with the Actual completion field.
  • ✓ Complete project, at the top of the project (Complete project permission): marks it as completed and releases everything that was assigned — workers, tools and vehicles are free for another project right away. Tools go back to stock, with no holder, and the vehicles leave the project.
  • 🗑 in the list (Delete project permission): deletes the project and everything linked to it — daily logs, costs, photos, documents and tasks.
Completing does not erase the history: the Team tab of the completed project still shows who worked on it and which tools were used, and that goes into the full report. The only thing that changes is availability — they stop being counted as busy. The same goes for a Cancelled project.
Deleting cannot be undone. To take a project out of circulation without losing the history, use the Cancelled or Completed status.

Inside the project and Overview

Click a project's name to open its workspace. At the top are the status, the percentage completed and the 🖨 Sheet, Edit and ✓ Complete project buttons. Right below are the tabs: Overview Schedule Daily log Costs Tasks Requests Photos Documents Team. The number on each tab shows how many records it has.

Overview

  • Physical progress, deadline (days left or late) and, for those who see costs, actual cost, budget variance and the amount received from the client (in the project details).
  • S-curve: the dashed line is the progress planned by the schedule; the solid one, the actual progress from the measurements. The p.p. vs. deadline badge compares physical progress with the time already elapsed — a negative number means a real delay.
  • Latest daily logs, project details, costs by category, upcoming phases and recent photos.
p.p. = percentage points. A project 40% done with 50% of the time elapsed is at −10 p.p.: ten points behind the clock.

Schedule and S-curve

Build the phases

In the Schedule tab, use the New phase box (Create phase permission; the pencil needs Edit phase and the trash can, Delete phase):

  • Name, planned start and planned end.
  • Weight: how much the phase represents in the project. It is relative and does not have to add up to 100 — for example, structure with weight 20 and cleaning with weight 5.
  • Assignee and description.
  • Sub-phase of: to break down a main phase. The project's overall progress is calculated from the main phases.
Always build the same phases? Save the sequence in Schedule templates and every new project starts with it.

On the timeline, the grey bar is the plan, the green one what has been done and the red mark is today. A phase past its deadline and not yet completed shows as Late. Use ✏️ to edit and 🗑 to delete.

Record progress (measurement)

  1. In the Record progress box (Record phase progress permission), choose the phase — or click 📈 on its row.
  2. Enter the cumulative progress in %, the measurement date and, if you like, a note.
  3. Click Record measurement.
The percentage is cumulative, not added: if the phase was at 40% and moved forward another 20, record 60.

The phase status changes by itself: 0% is Not started, above 0% In progress and 100% Completed. Each measurement goes into the Measurement history and feeds the S-curve on the Overview.

Complete a phase

Done? Click ✓ on the phase's row: it goes to 100% with today's date and shows as Completed — the completion also goes into the history and the S-curve. To reopen it, record a progress lower than 100%.

Always measure on the same day of the week — every Friday, for example. The S-curve becomes more accurate.

Daily log

The daily site report. Permissions: Write daily log, Edit and publish daily logs and Delete daily log.

Enter the day's log

  1. In the Daily log tab, fill in the New daily log box: date, work section (optional — e.g. Block A, km 2+300 to 2+800, Night shift), morning and afternoon weather (clear, cloudy, rainy, heavy rain) and the working condition (workable, partly workable or unworkable).
  2. Activities performed and incidents (rain, missing material, accident, inspection visit…).
  3. Labor: one row per person or per role. Choose the worker (those assigned to the project appear) or type the role, and enter quantity and hours. + Add row creates another. The day's headcount is the sum of the quantities.
  4. Equipment used: the tools linked to the project.
  5. Photos of the day: they are shrunk on the device itself before uploading and also go into the project gallery.
  6. Signatures, with a finger or the mouse — there are two: the one of whoever recorded the day and the one of the engineer of record / inspection (the project's engineer, the inspector or the client). Both are optional. When editing the log, a blank pad keeps the signature already saved, and Remove this signature deletes one made by mistake. On the printout, whoever did not sign in the system gets a free line to sign by hand. The second signature is always labelled Engineer of record, with no name — so the name of whoever signed the first one never appears there.
  7. Publishing: Visible to the client in the portal shares the entry with the client; Save as draft (not shown to the client) keeps it without showing it to them.
  8. Click Write daily log.
You can enter as many daily logs as you need on the same day — one per shift, work front or crew. Use the Work section field to tell them apart: it is shown next to the date in the list and on the printed report. To complete a log already entered, use ✏️.

The list shows the entries of the month chosen in the selector, newest first (logs from the same day appear together, with the work section next to the date), with the Draft and Internal (not visible to the client) badges. On each entry: 🖨 print, ✏️ edit and 🗑 delete.

Days marked as unworkable appear in the productivity report as idle days — useful to justify the deadline to the client.

Costs: budget × actual

The Costs tab only appears to those with the See project costs permission. Entering needs Enter budget, expenses and revenue; correcting with the pencil, Edit an existing entry; settling or undoing, Mark as paid and reverse payment; deleting, Delete entry. The client never sees costs.

Three types of entry

  • Budget (planned): what the project should cost.
  • Expense (actual): what has already been spent.
  • Income (received from the client): what the client has already paid — down payment, instalments, progress payments. It does not go into budget × actual: it is money coming in, not cost.

Enter

In New entry, enter type, description, amount, due date, category (materials, labor, equipment, services/subcontractors, administrative, other), the phase, the supplier and the invoice or document. Click Enter. For an income, category and phase disappear from the form and supplier becomes Paid by.

Already paid? Leave Already paid ticked and enter the date — it is the classic way, entering what has already happened. Still to pay? Untick it: it becomes a bill to pay, with the due date in force, and you settle it later with the ✓ Paid button in the list (or in Finance). You can enter it in instalments: enter the number of instalments and the system creates one bill per month.

Project finances

Below budget × actual, the tab shows the money coming in:

  • Contract — the value entered on the project, with the projected profit (contract − budget).
  • Received from client — the sum of the income and how much of the contract that is.
  • Receivable — what the client still has to pay.
  • Cash result — received − spent so far. Negative means the company is financing the project.
Fill in the contract value when editing the project to see the projected profit and how much is still to be received.
Link the entries to phases: the Costs by phase box shows how much of each work front has already been used and highlights in red the one that went over.

At the top are budget, actual (with the percentage of the budget), remaining budget or overrun and the variance. The chart compares budget and actual by category and the list can be filtered by type and category. When actual goes 5% over budget, the project appears in the Dashboard alerts. An approved request with an estimated amount goes in by itself as budget.

Photos

The Photos tab is the project gallery, organized by date. Uploading requires the Upload photo permission; deleting, Delete photo.

  1. In Upload photos, choose the files — you can select several at once (up to 20 per upload).
  2. Fill in caption, date and phase. Leave Visible to the client in the portal ticked if the client may see it.
  3. Click Upload photos.

Automatic compression

  • On the phone, each photo is shrunk before uploading. The screen shows the saving, for example “7.4 MB → 0.4 MB”: less data used on site and faster uploads.
  • On the server, the photo is straightened (photos taken with the phone upright), limited to 1600 pixels, saved as WebP — the lightest format browsers open, about 1/3 the size of a JPG with the same look —, loses its location data (GPS) and gets a thumbnail, so the gallery opens fast.
  • A 4 MB phone photo usually ends up at 100 to 300 KB. Clicking a thumbnail opens the full photo.
  • A file that is not really an image (even if named .jpg) is rejected and does not stay on the server.

Filter by phase at the top of the gallery. On each photo, 👁 Client sees / 🚫 Internal toggles visibility for the client and 🗑 deletes. Photos added in the daily log also appear here.

Caption and phase help you find the photo later and make the records clearer for the client.

Your photos and documents are private. A file's address only works for someone signed in to your company who can see that project; the portal client opens only what you shared with them. Copied a photo's link and sent it to someone outside? It will not open — to share, print the report or download the file and send it.

Documents

Contracts, drawings, permits and invoices in one place, in the Documents tab (Upload document and Delete document permissions).

  • In Upload document: the file (PDF, DOC, DOCX, XLS, XLSX, DWG, ZIP, TXT or image), the display name, the category (contract, drawing/sheet, permit, invoice, report, other) and Share with the client in the portal.
  • In the list: ↗ opens the file, 👁 Client sees / 🚫 Internal toggles visibility and 🗑 deletes.
  • Images (scanned invoice, photo of a document) are reduced to 2400 pixels — still readable and printable — and recompressed in the same format (JPG stays JPG).
  • PDF is recompressed when the server has Ghostscript (drawings and text stay sharp). Word, Excel, DWG and ZIP are already compressed by nature and stay as they arrived.
  • The Size column shows the space the file takes after compression, and the upload notice tells how much was saved.

Project team

This tab is the snapshot of what is assigned to the project: people, tools, materials and vehicles. With the Assign workers, tools and vehicles to the project permission, you can bring in whoever and whatever is free right here; the ✕ that releases them needs Remove workers, tools and vehicles from the project.

  • Assigned workers: who works on the project, with role and phone. Below the table, the Free worker list brings only those not on any project — choose and click Assign to project. The ✕ on each row releases the person.
  • Attendance in the daily logs: days and hours of each worker, calculated from the labor entered in the daily log.
  • Tools on the project, with their status and who has each one. The Free tool list brings only those not on another project or under maintenance; choose who keeps it and click Send tool to the project. The ✕ returns it to the warehouse, clearing the holder.
  • Materials delivered to the project: what has already left the warehouse, with the estimated cost.
  • Vehicles on the project: plate, who has it and the What is inside column, with the tools and materials in the vehicle. The Available vehicle list shows only those not on another project or under maintenance; choose who keeps it and click Assign vehicle to this project. Releasing the vehicle does not unload what is inside.
  • System access: tick the users who make up the team responsible for the project and click Save team.
Workers, tools and vehicles are brought in and released here. Materials from stock leave through the Requests tab — that is where the warehouse withdrawal happens, with who took it and in which vehicle. Also use Requests when the request needs approval, or when whoever asks does not have the permission to assign to the project.

Tasks

To-dos with a deadline and an assignee. The Tasks menu gathers those of all projects; the project's Tasks tab shows only its own. Both need the See company tasks permission (or create, edit or delete task) — but your own tasks appear on the Dashboard anyway.

Create

With the Create and assign tasks permission, fill in New task: title, project, phase, assignee, deadline, priority (low, medium, high, urgent) and description. Click Create task.

Progress

  • ▶ Start moves the task from pending to in progress; ✓ Complete closes it; ↩ Reopen brings back a completed one.
  • The assignee moves their own tasks even without the Edit task permission. Changing the text, the deadline or the assignee needs Edit task; deleting, Delete task.
  • Filter by status (open, overdue, completed, all), project and assignee (my tasks, unassigned). An overdue deadline shows in red and raises an alert on the Dashboard.

Estimates — the proposal that goes to the client

Estimates menu (permissions in the Estimates group: view, create, edit, delete and approve, each one separate): the sales document, before the project exists. Build the items, print it with your letterhead, send it to the client and, when they approve, the project is born with one click, already filled in.

Do not confuse it with the budget in the Costs tab, which is the planned spending of a project that already exists. This one is the price the client will pay.

Build

  1. Give it a title — it is what the client reads first — and choose the client. When you choose the client, their address comes in as the project location; you can change it.
  2. Set the estimate's validity (the default is 30 days).
  3. In + Add item, enter each line: description, category, unit, quantity and unit price. The total is the sum of the items, calculated by the system — you never type the total.
  4. Discount, if any. It comes off the selling price and does not touch the project's planned cost, because a discount is margin, not savings on material.
  5. What is included and Payment terms appear on the printout. Internal notes are for you only.

Send and follow up

  • 🖨 Print to send generates the estimate with your logo, the client's details, the table of items, the total and the two signature lines.
  • Mark it as Sent when you send it. The menu then shows how many estimates are out, and the Out card adds up what that represents.
  • Past its validity with no answer, it shows in red on the Expired with no answer card — it is your list of whom to chase.
  • Client said no? ✕ Declined. The estimate stays in the history.

Approve: the estimate becomes a project

✅ Approve and create project (Approve estimate and open the project permission) does everything at once:

  • Opens the project in planning, with the title, the client, the location and the contract value already filled in.
  • Enters each item as planned cost in the Costs tab — the project's budget × actual is in force from the start.
  • The estimate now points to the project, and it can no longer be deleted or approved again.

License — when the system runs on your company's server

OmniObra can run in two ways. On the website, with a monthly subscription — and then the My subscription menu takes care of everything. Or installed on your own organization's server, unlocked by an activation key, with no subscription. It is the path for city halls and for those who need to keep the data in-house. In that case the menu shows License instead of My subscription.

Activate

  1. Opening the system's address goes straight to the sign-in screen — there is no marketing page or "create account" here, because the installation belongs to your organization.
  2. When you sign in for the first time, the system asks for the activation key that came with the contract. It starts with OMNI2- and is long on purpose: it is meant to be pasted, not typed.
  3. Paste the whole key — hyphens, line breaks from the e-mail, upper or lower case do not get in the way — and click Activate system.
  4. Have an old, short key (OMNI-XXXX-XXXX-XXXX-XXXX)? It is still valid for a while and, if the server has internet, it is replaced by the new one automatically. Without internet, ask support for the new key — the License screen tells you until when the old one is valid.
  5. Done. If the server has no internet access, that is fine: the key already carries the validity and works anyway.

Follow up

  • The License menu (administrator only) shows the status, the validity, how many days are left and when the last check was.
  • The system warns at the top of the screen from 30 days before expiry.
  • Renewed the contract? Almost always there is nothing to do: the new validity arrives by itself. If you receive a new key, paste it in Change or renew the key.
  • Check now forces the check right away, without waiting for the daily one.

Where your data is

Everything — projects, daily logs, photos, documents, workers, finances — stays on your server, in your database. None of it is sent outside.

Once a day, the system asks whether the key is still valid. That conversation carries only these things: the key, your server's address and the database and system versions. The License screen itself lists these items, with the real values of your installation — you can print it and show it to IT or to the auditors.

An expired license deletes nothing. Access is suspended until renewal and all data stays intact on your server.

Update the system

When a new version comes out, the administrator sees a notice at the top of every screen, with the ⬆️ Go to Updates button; other users see a note asking them to tell the administrator. The system learns about the new version at login and then every hour. In License, the System update box shows the installed version, the new one and what changed.

  1. Pick a quiet time: while the files are being replaced (about a minute), anyone using the system sees a waiting screen.
  2. Click Update now and confirm.
  3. The system downloads the version, checks OmniObra's signature, saves the current files in uploads/.backups and installs it. If the version changed the database, the installation screen opens and finishes by itself.
Photos, documents, the server configuration and the database data are not touched. If something fails halfway, the files are put back as they were. If the screen says it can't be updated from there (for example, no write permission on the hosting), the update is done with the zip file, as before — ask support.

Check for updates checks right away whether there is a new version, without waiting for the daily check.

Requests and approvals

The path of a request from the site to delivery: request → approval → delivery. The screen opens for those with See requests, Open a request, Delete request or Approve / reject and fulfill.

Ask

With the Open a request permission, use New request in the Requests menu (or the Dashboard shortcut, or the project tab): project, what is needed, quantity, unit, estimated amount, type (material, service, equipment, other), urgency and reason. Click Send request.

Asked for the wrong thing? While the request is pending, whoever asked cancels it with Delete on the request itself — no permission needed for that. Once approved, or someone else's request, only those with Delete request.

Ask for what the company already has

The first field of the request is Request something the company already has, with these groups:

  • Material in stock — only what has a balance in the warehouse, with the quantity next to it. The name, the unit and the estimated amount come from the record.
  • Available tool — only those not on a project or under maintenance.
  • Worker with no project — only those not assigned to any project.
  • Available vehicle or machine — cars, pickups, trucks and machines not on another project or under maintenance, with the plate and the type.

Leaving it at another item (buy or hire), the request is free text and follows the normal approval path — it is the way to ask for what still has to be bought.

Fulfill right away, without buying

When the request points to something in the records, whoever has Receive stock, ship to projects and adjust balance sees the green Fulfill from stock box inside the request itself, with who took it and in which vehicle. What happens on confirming:

Request forWhat the system does
MaterialWithdraws the quantity from stock, records the issue to the project and closes the request. If the balance does not cover everything, it delivers what there is and the request stays open with what is missing.
ToolLinks it to the project, marks it as in use and records who has it.
WorkerAssigns them to the project; they then appear in the Team tab.
Vehicle or machineAssigns it to the project, marks it as in use and records who has it. A machine under maintenance is refused.

With no balance, the request shows Out of stock and offers the shortcut to receive stock in Materials.

Approve and deliver

  • Those with Approve / reject and fulfill see the number of pending ones in the menu. Write a note, if you like, and click ✓ Approve or ✕ Reject.
  • When a request with an estimated amount is approved, it goes in as budget in the project's Costs tab.
  • When the purchased material arrives, 📦 Mark as delivered. Fulfilling from stock already marks it as delivered by itself.
  • The cards at the top (awaiting approval, approved, rejected, delivered) filter the list.
  • Whoever approves can delete any request; whoever asked, only while it is pending.

Company finances

Finance menu (See company finance permission). Here is the money of all projects together, plus what belongs only to the company — rent, accountant, office, vehicles. The client never sees this screen.

The four numbers at the top

  • Receivable and Payable: everything open, from any month, with how much of it is already overdue in red.
  • Received in the period: what actually came in between the two filter dates.
  • Result for the period: received − paid. Negative means more went out than came in during that interval.

Cash flow

The table shows eight months — two back, the current one (highlighted) and five ahead. The In and Out columns are what has already happened; Receivable and Payable are the open bills, placed by due date. It is what answers “will I have money in December?”.

The running total is the sum of those months' balances — it is not your bank account balance. The system does not track bank accounts.

The list

  • It shows what falls due in the chosen period plus everything overdue and unpaid, from any month. A late bill does not disappear from the screen when the month turns.
  • Filters by type (payable / receivable), status, project, period and search by description, supplier or invoice number.
  • ✓ Paid / ✓ Received settles it with today's date. Made a mistake? The ↩ undoes it and the entry goes back to open.
  • The Project column goes straight to its Costs tab; company means the entry does not belong to any project.

Enter

  1. Choose Bill to pay or Bill to receive.
  2. Description, amount and due date.
  3. Project: leave it at company (no project) for rent, accountant and the like.
  4. Instalments: 10, for example, creates ten bills, one per month, from the due date — each with (1/10), (2/10) at the end of the description.
  5. Tick Already paid if it has already happened.

Recurring bills (repeat every month)

Rent, accountant, internet, the monthly fee a client pays: tick 🔁 Repeat every month (recurring bill) when entering it. It works for bills to pay and bills to receive. The system enters the first month right away and, every new month, enters the same bill by itself, on the same due day — until you end it. If the day does not exist in the month (31st in February), it falls due on the last day.

  • In the list, recurring entries carry the 🔁 recurring mark. Each month is a bill of its own: settle, correct (✏️) or delete just that month without touching the others.
  • The Recurring bills box, below the form, lists all active ones. In Change or end you change description, amount and day — from the next months on — or end it: it stops being added, and what was already entered stays on the list.
  • Already paid together with a recurring bill applies to the first month only. A recurring bill cannot be split into instalments.
  • Nobody logged in for a while? The months left behind are entered on the next access.
Money amounts: type only the digits, no comma or point — the field arranges itself, like a banking app: 150000 becomes 1,500.00. The cents come in from the right. Pasting also works: 1500, 1,500.00 and 1.500,00 all come in right. It applies to every amount field in the system.

Correct a bill already entered

The pencil ✏️ on the row (Edit an existing entry permission) opens the bill in the form on the right to correct description, amount, due date, project, category, supplier and invoice.

Bill already paid: amount and due date are locked. Changing them now would rewrite what has already left the till. If the amount paid was wrong, use ↩ to undo the settlement, correct it and settle it again — the trail stays in the activity log. Description, supplier and invoice can still be corrected after payment.
What you enter inside the project (Costs tab) appears here automatically, and vice versa — it is the same information seen from two places. The Budget is the exception: it is planned cost, not a bill to pay, so it does not go into finances.

When there is an overdue bill, the number appears next to Finance in the menu and a red bar at the top of the screen says how much it is.

Monthly bills report (to print)

The 🖨 Bills for … button, at the top of the screen, opens the month's report on a clean sheet, with your company's logo and details in the header. It is the paper to take to the accountant, show your partner or file.

  • Summary: receivable, payable, open and overdue.
  • Accounts receivable and Accounts payable, each with due date, description, project, document, status and amount — and the total at the end.
  • Expenses by category, with the percentage of each.
  • Closing: received, paid and the month's cash result.
The report's month is the one of the filter's start date — to print another month, change Due from and click Filter first. If a project is filtered, the report comes out with that project only, and its name appears in the header.
The report includes bills from previous months that are still unpaid — so nothing overdue is left out. The project's budget is not included: it is planned cost, not a bill to pay.

Reports

Reports menu (Access reports permission). Choose the report from the list and click Generate. The filter fields change with the report: project reports ask for the project and the period; record reports are a snapshot of today, so there is no project filter.

Project reports

ReportWhat it shows
Project progressPhysical progress × time progress of each project and its status: On schedule, Attention or Late, with the difference in p.p.
CostsBudget × actual per project and per category in the period, with contract, received from the client, result (received − spent), variance, burn and totals.
ProductivityDaily logs entered, man-days (sum of the headcount), average headcount, idle days (unworkable) and hours per role.

Sales

ReportWhat it shows
EstimatesThe estimates created in the period, with status, validity, discount and total. On top: amount approved, amount awaiting an answer, how many are past their validity and the approval rate (approved ÷ answered).
ClientsThe portfolio: how many estimates and projects each client has, contracted value, how much has been received and how much is still receivable.

Warehouse and fleet

ReportWhat it shows
SuppliersHow much was bought from each one in the period, how many bills, what is open today (not only in the period — an old debt does not vanish when the month turns) and the date of the last purchase.
Materials and stockBalance, minimum, unit cost and stock value of each item, plus the period's receipts and issues. The quantity is not added up in the total: each material has its own unit (adding 10 bags to 200 meters would mean nothing). What adds up is the money value.
Vehicles and machinesWhere each vehicle is, who has it, how many different materials and how many tools are inside it, and the mileage.

Team

ReportWhat it shows
WorkersWhich projects each one is on, how many tools and vehicles they have, days and hours entered in the daily log in the period, and the estimated cost (days × the registered daily rate). It is a report estimate, not an entry in finances.
ToolsThe status of the assets item by item: which project it is on, who has it and in which vehicle it is stored.

Use 🖨 Print / PDF to generate the document with your company's header.

Activity log

Activity log menu. It is the log of who did what in the company: every action that changes data records a line with the person, the date and time, what was touched and the network address it came from. Everyone reads the log in their own language: whoever uses the system in Portuguese sees the same lines in Portuguese, with dates and amounts in their format.

This screen opens only for those with the See who changed or did what permission — and for the company administrator, who has all of them. Whoever comes in here sees what everyone did, so give this permission to those who oversee, not to those who enter data.
What is recordedExamples of what you see
Projectsregistered, changed (with what changed), completed, deleted
Daily log, schedule and tasksdaily log entered or deleted, progress recorded from 40% to 60%, phase completed, task created or moved
Moneyexpense and income entered, settled, settlement undone, entry deleted — always with the amount
Stock and fleetreceipt, issue to a project, loaded into a vehicle, return, stock count (from how much to how much), tool sent, vehicle assigned and released
Requests and estimatesrequest opened, approved, rejected and fulfilled; estimate created, sent, declined and approved becoming a project
Recordsclient, supplier, worker, tool, material and vehicle — created, changed or deleted
Access and permissionssigned in, signed out, password changed, PIN changed, sign-in attempt with a wrong password, user created (saying how many permissions they got) or deleted
  • Filter by person, by where (project, finance, stock…), by type of action, by project, by period, or search for text. Use 🖨 Print / PDF to take it on paper.
  • Inside each project, the Overview tab has the Who changed this project box with its latest actions — also only for those with the permission.
  • The name of whoever did it is recorded on the spot. If the user is deleted later, the entry still says who it was — a log that vanishes with its author would be useless.
  • No one deletes or edits the log through this screen, not even the administrator. There is no button for it, on purpose.
  • The log is kept from the update that created it on: what was done before does not appear, because there was nowhere to keep it.
  • Each entry stays in the language it was recorded in: an action done by someone using the system in Portuguese is described in Portuguese.

Print and save as PDF

DocumentWhere
Daily log reportDaily log tab → 🖨 on the entry
Project sheet and statement of responsibility🖨 Sheet at the top of the project, or 🖨 in the projects list
Full project report — schedule, costs and entries, tasks, requests, resources, documents, all the daily logs and the photos🖨 Full report at the top of the project
Monthly bills (payable and receivable) Finance→🖨 Bills for …
ReportsReports→🖨 Print / PDF
This manual🖨 Print / PDF at the top of this page
  • Every document comes out with your company's logo and details in the header (see Company details) and the issue date in the footer.
  • Documents come out in the language of whoever prints them.
  • To save as PDF: in the print window, choose Save as PDF instead of the printer. On a phone: share → print → save as PDF / files.
  • The project sheet shows the costs block only to those allowed to see costs.
In the print window, untick Headers and footers so the document comes out without the browser's address in the corner of the page.

Full project report

It is the whole project in a single document, with what each tab shows:

  • Schedule: S-curve and the phases, with planned, actual, weight and progress.
  • Costs and finances: budget, actual, balance, variance, contract, received, receivable, cash result, the budget × actual chart, costs by category and by phase.
  • Entries: every entry in the Costs tab, split into budget, expenses and income, with supplier, due date, status (paid, open, overdue) and total.
  • Tasks, with assignee, deadline (overdue ones marked), priority and status.
  • Requests, with who asked, who approved, delivery and estimated amount.
  • Team and resources: project users, workers, tools, vehicles and materials.
  • Documents: the list of the project's files.
  • Daily log: all daily logs, with weather, headcount, activities, incidents and the photos as thumbnails. Drafts come out marked as drafts.
  • Photos outside the daily logs and the signatures.

At the top, What to print: lets you untick the parts you do not want on paper — the browser remembers the choice for next time. Next to it, the period limits entries, requests, daily logs and photos to an interval (the month's measurement, for example); the totals and the schedule stay for the whole project.

Each person prints what they can see in the tabs: whoever has no costs permission does not get costs or entries, and the same goes for tasks and requests. The portal client gets only the daily logs published and shared with them, the shared photos and documents, and no costs, tasks, requests or team.

Workers and tools

Workers

Workers menu: full name, role, phone, ID/registration and daily rate. Click Add worker. When editing you can mark them as inactive — they disappear from the assignment lists without losing the history. A worker who has already been assigned to projects is not erased: deleting makes them inactive. Permissions: See workers (opens the screen), Register, Edit and Delete worker.

This list shows each one's ID document and daily rate. Give See workers only to those who need that information — whoever registers, edits or deletes already gets in without it.

Tools and equipment

  • Tools menu (See tool inventory permission, or whoever registers, edits and deletes): equipment, asset tag (cannot repeat), category and notes.
  • Status: Available, In use or Maintenance. When assigned to a project, the tool becomes in use; when the project is completed, it goes back to available. A tool under maintenance does not change with the assignment.
  • The Where it is column shows the project — or Stock. The cards at the top filter by status.
  • A tool linked to a project cannot be deleted: release it first.

Clients and client portal

Register the client

Clients menu (permissions in the Clients group: view, register, edit and delete, each one separate): name or company name, tax ID (CPF/CNPJ in Brazil), e-mail, phone, address and notes. Then choose this client when registering the project.

For Brazilian companies: typing the full CNPJ, the system pulls the name, address and phone from the Brazilian tax authority; the CEP (postcode) field next to the address is only used to look up the street (it is not stored).

Give portal access Administrator

  1. In the clients list, click Create login.
  2. The users screen opens with the type Client (portal) and the client already chosen. Set the login and the password and click Create user.
  3. Send the system's address, the login and the password to the client.

What the client sees Client

  • My projects: physical progress, start, expected delivery, S-curve and the engineer of record of each project linked to them.
  • Daily logs that are published and visible, shared photos and documents.
  • Can print the daily log and the project sheet.
  • Never sees: costs, drafts, internal photos and documents, tasks and requests.
  • The client also chooses their own language, with the PT | EN buttons.
Before opening the portal, check the photos and daily logs marked as visible — it is what the client is going to see.

Suppliers

Suppliers menu (permissions in the Suppliers group: view, register, edit and delete): who sells you materials and services. Keep the name and company name, tax ID, contact/salesperson, phone, e-mail, full address and, above all, what they supply.

The Products and services field goes into the search: you can search for “gravel” and find who sells gravel, without remembering the store's name.

Let the system fill it in (Brazil)

  • Type the full CNPJ and leave the field: the system looks it up at the Brazilian tax authority and fills in name, address, city, state, postcode and phone.
  • Type the CEP (postcode) and leave the field: street, district, city and state come in.
  • It only fills in what is empty — nothing you typed is overwritten. With no internet or with the document not found, a notice appears and you fill it in by hand.
  • It works the same way in Clients, in Company details and in the tax details of the subscription.
  • The Open column shows how much you still owe each one — it comes straight from the bills to pay in Finance.
  • Each stock material can have a usual supplier, which appears in the materials list.
  • Deleting a supplier that already has materials or bills linked to it does not erase it: it becomes inactive, disappears from the choice lists and the history stays intact.

Materials and stock

Materials menu (Materials and stock group: view, register, edit and delete material, and Receive stock, ship to projects and adjust balance to move stock): the warehouse. Each material has a name, code, unit (bag, kg, m², liter…), category, unit cost, usual supplier and minimum stock.

Register

In the New material box, the opening balance you enter already goes in as a receipt in the history — the stock never has a balance nobody knows the origin of.

Move stock

What happenedEffect
Receipt — bought / receivedadds to the stock (and updates the unit cost)
Sent to a projecttakes it out of stock and it appears on the project
Loaded onto a vehicletakes it out of stock and it stays inside the vehicle
Unloaded from vehicle at the projectleaves the vehicle and goes into the project (the stock does not change, it had already left)
Returned to the warehousegoes back to stock
The system does not let you take out what does not exist: neither more than there is in the warehouse, nor more than is inside the vehicle.

Send material to the project

Two paths, the same effect: ask for it in the Requests tab — whoever runs the warehouse fulfills it from stock — or, in Materials, enter the movement Sent to a project and choose the project. It leaves the stock right away, and the project's Team tab then shows everything it received, with the estimated cost.

Stock count, zeroing and shortage

  • Counted and it does not match? In Edit → Stock count adjustment, enter the counted balance: the system corrects it and records the difference in the history, with the reason. The field comes with today's balance, and can be changed to 0.
  • Ran out completely? The Zero stock button, right below, sets the balance to zero at once and leaves the withdrawal in the history.
  • Items below the minimum stock show in red, on the Below minimum card and with a number next to Materials in the menu.

How to type quantities

  • In English, the point is the decimal: 100.5 is a hundred and a half.
  • The comma separates thousands: 1,500 is one thousand five hundred.
  • A value typed in the Brazilian format (1.500,5) is also read correctly.
  • On screen, the balance appears without needless zeros — 100 is 100, not "100.000".

Vehicles and fleet

Vehicles menu (Vehicles and fleet group: view, register, edit and delete vehicle, and Assign to a project and load/unload): cars, pickups, trucks and machines. Register the plate, make, model, year, color, type and mileage.

Who has it and on which project

On each vehicle, the assignment box sets the project, who has it and the status. The worker's phone appears right there, so you can call without searching.

Status and project always tell the same story:

  • Marked Available: the vehicle goes back to the garage — it leaves the project, leaves the Team tab list and is cleared from whoever had it.
  • Marked Maintenance: it leaves the project too (it is not there), but stays with the person responsible.
  • Chose a project: it becomes In use by itself, even if the status on the screen was still Available.

What goes inside the vehicle

  • Tools: choose and click + Store. The ↩ takes it back out. A tool can only be in one vehicle at a time.
  • Material: load it through Materials → Loaded onto a vehicle. The vehicle then shows what it carries and how much.
  • On arriving at the project, Unloaded from vehicle at the project takes it off the vehicle and delivers it to the project.
In the project's Team tab, the Vehicles on the project box shows plate, who has it and the What is inside column, listing tool by tool (with the asset tag) and material by material (with the quantity) — also in the printed full report. There you can also assign an available vehicle to this project and release it later, without going through the fleet records.
A vehicle with tools or materials inside cannot be deleted: unload it first.

Schedule templates

Schedule templates menu (Schedule templates group: view, create, edit and delete template): the lists of phases that appear when registering a project. Build yours once and every new project comes out with the schedule ready.

Create a template

  1. In the New template box, give it a name (e.g. “Bathroom renovation”) and, if you like, a description.
  2. Fill in the phases in order of execution: name and weight. Use + Add phase to open more rows and ✕ to remove one.
  3. Click Create template.
The weight is how much the phase represents in the project — it is relative and does not have to add up to 100 (structure 20, cleaning 5). It also splits the deadlines between the project's start and planned completion. Leaving all weights blank, the phases are the same size.

Start from a ready-made list

The system already has lists by type of work — construction (simple and detailed), interior renovation, façade and signage (ACM), painting, electrical installations, joinery, urban paving, road signage and a “Master” list with all phases together. They appear when registering the project even without copying them, and in English the phase names come in English. Click Copy and edit to have your own version and change whatever you want.

Duplicate, edit and delete

  • ✏️ opens the template in the box alongside to rename phases, change weights and reorder.
  • ⧉ duplicates the template — useful to create a variation without losing the original.
  • 🗑 deletes the template. Projects already registered with it do not change: the template is only the mold used at the moment of registration.

Use it on the project

In Projects→+ New project, the Create an initial schedule? box lists your templates first and then the ready-made lists, with the Don't create a schedule option at the end. Enter the start and the planned completion so the system spreads the deadlines; without both dates, no phase is created.

Company details and logo Administrator

Company details menu: what appears in the header of all printed documents.

  • Company logo: PNG, JPG or WEBP up to 2 MB. It looks best as a PNG with a transparent background, in landscape format. Click Upload logo; to remove it, Remove logo.
  • Information on documents: company name, tax ID (CNPJ or CPF in Brazil), phone and address. Click Save information.
  • Country: in Brazil you get the CNPJ/CPF with lookup at the tax authority, the CEP and the Brazilian invoice for the subscription. In any other country, the document is a free-form Tax ID (letters allowed), and the subscription is charged in US dollars.
  • Currency for amounts: the symbol used in costs, finance and documents (R$, $, €…). Changing it does not convert anything already entered — it is only the unit.
  • Default system language: the language for everyone in the company who has not chosen one in their profile.
  • The header preview shows how the page will come out, and the link below it opens a project sheet to check the whole document.
Is the logo an SVG or PDF? Open the file and export it as PNG — those formats are not accepted, for security. The account e-mail does not change here because it is the billing contact: ask support to change it.

Users and permissions Administrator

Create a user

  1. Users and access menu, New user box.
  2. Access type: Internal team or Client (portal).
  3. Name, login, e-mail, phone, role and password (at least 6 characters).
  4. For the team: tick General administrator (full access) or choose the permissions one by one. For a client: choose the linked client.
  5. Create user.
  • Deactivate without deleting: untick Active user (can sign in).
  • Reset someone's password: edit the user and fill in New password (blank keeps the current one).
  • When a user is deleted, their tasks are left without an assignee.
  • You cannot remove your own administrator access or delete your own account.
  • Each plan has a limit of active users; the system warns you when it is reached.

View, register, edit and delete: each one is a box

Every screen with records follows the same pattern, with four separate permissions:

PermissionWhat it unlocks
ViewOpens the screen and the list. Without it (and without the other three), the item does not even appear in the menu and the direct address is refused.
RegisterThe new record form.
EditThe pencil ✏️ on each row.
DeleteThe trash can 🗑 on each row.

It applies to estimates, clients, suppliers, materials, vehicles, workers, tools, tasks and schedule templates. Some screens also have an action of their own: Move stock (receive, send to the project, adjust balance), Assign vehicle, Approve estimate, Approve request. In costs and finances, entering, editing an existing entry, settling and deleting are separate boxes too.

A button the person cannot use does not even appear — and even if someone tries through the direct address, the server refuses.

Whoever can act can also see. Ticking Register worker already opens the Workers screen, even without ticking See workers — otherwise the permission to register would be useless. Use View alone for those who only need to look things up.
Example — the site foreman. Tick See projects and Assign workers, tools and vehicles to the project: they build the team in the Team tab, but cannot touch the contract, the dates or delete the project. For them to also take people off the project, tick Remove workers, tools and vehicles from the project.
ScreenWho sees itWhy
WorkersSee workers, or whoever registers/edits/deletes The list shows each one's ID document and daily rate.
ToolsSee tool inventory, or whoever registers/edits/deletes It is the company's assets, with the tag and where each piece is.
RequestsSee requests, whoever opens or whoever approves The queue shows what every project asked for, with the estimated amount.
TasksSee company tasks, or whoever creates/edits/deletes tasks The list covers all projects. The person's own tasks stay on the Dashboard, with no permission needed.
Costs and FinanceSee project costs / See company finance Project and company amounts.

The same door applies on all three paths: the menu, the tab inside the project and the subject's report. Without the permission, the workers or fleet report does not appear in the reports list either.

Only what they registered themselves

The first box in the list, See what other users created, decides the person's scope across the whole system. Unticked, they see only what they registered themselves: a salesperson sees their own estimates and clients, not a colleague's.

  • It applies to clients, estimates, suppliers, materials, vehicles, workers, tools, schedule templates, finance bills, tasks and requests — in the lists, on the dashboard, in the alerts, in the reports, in the printouts and in the forms' choice lists.
  • Projects: they see those they registered, those where they are the assignee and those where they were ticked in Team → System access. Inside those projects they see everything that belongs to the project (daily log, photos, costs, tasks), because it is team work.
  • Not even through the direct address can they open, edit or delete what belongs to someone else.
  • The administrator always sees everything. So does whoever has the box ticked.
Example — the salesperson. Tick the Clients and Estimates permissions and leave unticked See what other users created. They register their own clients, build their own estimates, and do not see the other salespeople's portfolio.
Updating? Those already registered keep seeing everything, as before — the box comes ticked. A new user comes with it unticked: tick it if they need to see what others registered. Old records keep their author in the activity log; what dates from before the log existed has no author and only appears to those who see everything.

What each permission unlocks

AreaPermissions
Scope See what other users created (without this, they only see what they created themselves)
Dashboard See the dashboard (home screen) · See the number cards on the dashboard
Projects See projects · Add project · Edit project · Delete project · Complete project · Assign workers, tools and vehicles to the project · Remove workers, tools and vehicles from the project
Daily log Write daily log · Edit and publish daily logs · Delete daily log
Project schedule Create phase · Edit phase · Delete phase · Record phase progress
Schedule templates See templates · Create template · Edit template · Delete template
Costs and finance See project costs · Enter budget, expenses and revenue · Edit an existing entry · Delete entry · Mark as paid and reverse payment · See company finance
Tasks See company tasks · Create and assign tasks · Edit task · Delete task
Requests See requests · Open a request · Delete request · Approve / reject and fulfill
Photos and documents Upload photo · Delete photo · Upload document · Delete document
Workers See workers (name, ID and daily rate) · Add worker · Edit worker · Delete worker
Tools See tool inventory · Add tool · Edit tool · Delete tool
Clients See clients · Add client · Edit client · Delete client
Suppliers See suppliers · Add supplier · Edit supplier · Delete supplier
Materials and stock See materials and stock · Add material · Edit material · Delete material · Receive stock, ship to projects and adjust balance
Vehicles and fleet See vehicles · Add vehicle · Edit vehicle · Delete vehicle · Assign to a project and load/unload
Estimates See estimates · Create estimate · Edit estimate · Delete estimate · Approve estimate and open the project
Reports Access reports
Activity log See who changed or did what

Only the administrator sees Company details, Users and access and My subscription. The administrator always passes every permission.

Updating from an earlier version? Nothing changes overnight:
  • The screens that were open to the whole team (dashboard, projects, tasks, requests, workers, tools) stay open to those who were already registered.
  • Where there used to be a single permission — Manage clients, Manage suppliers, Manage estimates… —, whoever had it receives the four new ones (view, register, edit, delete). Whoever entered costs also receives edit and settle; whoever edited projects receives assign and remove team; whoever approved requests receives delete request.
To restrict, untick it on the users screen; from then on the ticking rules, and updating the system again does not undo what you restricted.

Subscription and payment Administrator

  • My subscription menu: status (on trial, active, expired, blocked, cancelled), days left and how much of the plan is in use (projects and users).
  • In the plans, Subscribe or Renew opens Mercado Pago to register the card, as a recurring subscription. With each approved charge, the days of the subscribed plan come in by themselves and the payment appears in the Payment history. Subscribed to another plan? The company moves to it and the old subscription is cancelled automatically — no double charge.
  • With 5 days or less to go, a notice appears at the top of every screen.
  • Expired? The system is blocked until renewal, but no data is lost. The administrator sees the Renew subscription now → button; the team is told to talk to them.
  • Prefer PIX? Each plan also has Pay with PIX: the screen shows the QR code and the copy-and-paste code for one period of the plan (a month, a year…), valid for 30 minutes. Pay in your bank app and wait: as soon as the PIX goes through, the screen takes you back to the dashboard with the days already added — and if you chose a different plan, the company moves to it. Unlike the card, PIX does not renew by itself: pay again when the expiry notice shows up. The button also appears on the expired-subscription screen.
  • Bank transfer or another method? Talk to support: the payment is entered manually and the days are credited.
  • Companies outside Brazil see plan prices in US dollars and do not need the Brazilian invoice details. Subscribe takes you to the Stripe payment page, by card; the days come in by themselves when the payment is approved. To change the card, see the invoices or cancel, use Manage card and subscription ↗.

Invoice details (Brazil)

In the Invoice details box, fill in the company name, CPF/CNPJ and the full address (CEP, street, number, district, city, state and the city's IBGE code). These are the fields the city hall requires to issue the Brazilian service invoice (NFS-e) for the monthly fee — that is why the subscribe button only appears once everything is filled in.

Do not know your city's IBGE code? It has 7 digits; search for “código IBGE” plus the city's name (São Paulo, for example, is 3550308).

The invoice appears in the Invoice column of the payment history, with the number and the ⬇ PDF link — and, if configured that way, it also arrives by e-mail. While the city hall has not answered, the column shows being issued.

Depending on how the subscription was configured, the invoice is issued for each monthly fee or once a month, adding up that period's charges. When it is monthly, the charges of the same month all point to the same invoice (month's invoice appears next to the number).

Support All

  1. Support menu: say what happened, give the details (what you did, what you expected, what appeared), choose the severity and check the reply e-mail.
  2. Click Send to support. You receive a ticket number.
  3. Follow it in Your tickets: open, under review, resolved or dismissed. The answer appears right there, in the Support reply box.
Open support from the screen where the problem happened: its address goes along and helps solve it faster.

My profile, password and PIN All

My profile

My profile menu: name, login, e-mail, phone and role. To change the password, enter the current one and the new one twice. The What you can do box lists your permissions.

Language: Portuguese or English

  • In My profile → Language, or with the PT | EN buttons at the bottom of the menu. It applies only to you: each person in the company uses the system in their own language.
  • Whoever has not chosen follows the company's default language, which the administrator sets in Company details.
  • In English, dates come out in the American format (10/31/2026) and numbers with a decimal point (1,234.56). The money symbol follows the company's currency, not the language: a company in reais sees R$ in both languages. What you type — project names, phases, descriptions — stays as it was written.
  • Every screen, the ready-made schedule lists, the printed documents and this manual are in English. The activity log stays in the language each action was recorded in.

Recovery PIN

  • 4 to 6 digits. Changing it requires the current password. Obvious numbers, like 1111 and 1234, are refused.
  • While the PIN is the default 0000, a notice appears on every screen. 0000 only works to recover the password in the account's first 24 hours (or after support resets it): create your PIN soon, otherwise, if you forget the password, you will need to ask for help.

I forgot my password

  1. On the sign-in screen, click Forgot my password.
  2. Enter the login or e-mail and the PIN, and click Continue.
  3. Create the new password within 10 minutes. If the account was still using 0000, the screen offers to create the PIN right there.
  • Forgot the PIN too, or still on 0000 after the deadline? Support resets the PIN to the default 0000, which works again for 24 hours. Team users can also ask the company administrator for a new password.
  • After 5 wrong PINs, recovery for that login is blocked for 30 minutes.

Frequently asked questions

Does it work on the phone? Do I need to install it?

It works in the phone's and the computer's browser, with nothing to install. Tip: in the browser's menu, use Add to Home screen to create a shortcut with the OmniObra icon.

Do I need internet?

Yes, at the moment of recording. With a weak signal, the photos shrunk on the device help a lot.

The Costs tab does not appear.

The See project costs permission is missing — ask the administrator.

Can I enter two daily logs on the same day?

Yes — as many as you need. Fill in the Work section on each one (shift, block, stretch of road) to tell them apart in the list and on the printout. If an error appears, ask the administrator to open instalar.php once: that is what allows several logs per day on older installations.

The S-curve does not appear.

Register phases with planned start and end in the Schedule and record the measurements.

The client says they cannot see the daily log.

Check that the entry is marked as Visible to the client in the portal and is not a draft. Photos and documents also need to be shared.

“The upload exceeded the server limit” appeared.

Too many photos at once. Upload them in smaller batches.

An old photo is lying sideways.

New photos are straightened by themselves. Photos uploaded before this improvement stay as they were: download, rotate and upload again, if needed.

“Session expired. Reload the page” appeared.

The page was open for a long time. Reload and redo the last action.

Is my data lost if the subscription expires?

No. Access is suspended, and everything comes back as it was as soon as the subscription is renewed.

Nothing found for that search. Try another word — for example, “photo”, “password” or “PDF”.

OmniObra v2026.11.13.1 · User guide